In May 2009, the pipe route was laid out and digging of pipe trenches began. Construction of the electrical and foundation work for the pump house was also completed. The social team met with teachers to gain a better understanding of the education system. They partnered with a science class in Pueblo Nuevo and taught them about performing water tests. In January 2010, the piping system was completed, the tank waterproofed, a hypochlorinator installed. A camera exchange and pen-pal program between the children of Pueblo Nuevo and middle-school children in Bethlehem, PA reinforced the education about the system and create a cultural exchange between the students.